{
  "$schema": "https://json-schema.org/draft/2020-12/schema",
  "$id": "https://docs.demiton.io/registers/construction_methodology/v1.json",
  "title": "construction_methodology contract v1",
  "type": "object",
  "required": [
    "hazards",
    "method_steps",
    "source_path",
    "title"
  ],
  "properties": {
    "title": {
      "type": "string",
      "description": "The document's title / works name; also the record-identity fallback when the basename is absent",
      "x-demiton-requiredness": "required"
    },
    "hazards": {
      "type": "array",
      "description": "Actual hazards / risks only (not controls, not prose mentioning \"risk\")",
      "x-demiton-requiredness": "required"
    },
    "source_path": {
      "type": "string",
      "description": "Storage locator of the source document the record was extracted from",
      "x-demiton-requiredness": "required"
    },
    "method_steps": {
      "type": "array",
      "description": "The ordered construction method — the sequence of actions the crew performs",
      "x-demiton-requiredness": "required"
    },
    "work_activity": {
      "type": "string",
      "description": "Short phrase naming the primary activity (e.g. a foundations or slope-stabilisation activity)",
      "x-demiton-requiredness": "optional"
    },
    "sequence_notes": {
      "type": "string",
      "description": "One-to-three sentence summary of overall sequencing / staging",
      "x-demiton-requiredness": "optional"
    },
    "plant_equipment": {
      "type": "array",
      "description": "Plant / equipment items used, deduplicated",
      "x-demiton-requiredness": "optional"
    },
    "source_file_name": {
      "type": "string",
      "description": "Basename of the source document",
      "x-demiton-requiredness": "optional"
    }
  },
  "x-demiton-register-type": "construction_methodology",
  "x-demiton-contract-version": "1.0.2",
  "x-demiton-store": "tenant",
  "x-demiton-axes": [],
  "x-demiton-measures": [],
  "x-demiton-provenance": {
    "standards": [
      {
        "code": "AS ISO 19650.1:2019 / AS ISO 19650.2:2019",
        "title": "Information management using BIM (Parts 1 and 2)",
        "access": "public_summary",
        "region": "Australia",
        "edition": "2019",
        "checked_on": "2026-09-14"
      },
      {
        "code": "AS/NZS ISO 14001:2016",
        "title": "Environmental management systems - Requirements with guidance for use",
        "access": "paywalled_secondary",
        "clause": "10.2",
        "region": "Australia",
        "edition": "2016",
        "checked_on": "2026-09-14"
      },
      {
        "code": "AS/NZS ISO 45001:2018",
        "title": "Occupational health and safety management systems - Requirements with guidance for use",
        "access": "paywalled_secondary",
        "clause": "6.1.2.1 hazard identification; 6.1.2.2 risk assessment; 8.1 operational planning and control",
        "region": "Australia",
        "edition": "2018",
        "checked_on": "2026-09-14"
      },
      {
        "code": "AS/NZS ISO 9001:2016",
        "title": "Quality management systems - Requirements",
        "access": "paywalled_secondary",
        "clause": "7.5 documented information",
        "region": "Australia",
        "edition": "2016",
        "checked_on": "2026-09-14"
      },
      {
        "code": "Model WHS Act",
        "title": "Model Work Health and Safety Act",
        "access": "public_summary",
        "clause": "ss 35-39",
        "region": "Australia",
        "edition": "model law",
        "checked_on": "2026-09-14"
      },
      {
        "code": "Model WHS Regulations",
        "title": "Model Work Health and Safety Regulations (safe work method statements)",
        "access": "public_summary",
        "clause": "reg 299 (SWMS for high risk construction work: identify the work, hazards, risks, controls and implementation); SWMS copy kept 2 years after a notifiable incident",
        "region": "Australia",
        "edition": "model regulations",
        "checked_on": "2026-09-14"
      },
      {
        "code": "ISO 45001:2018",
        "title": "Occupational health and safety management systems - Requirements with guidance for use",
        "access": "paywalled_secondary",
        "clause": "6.1.2.1; 6.1.2.2; 8.1",
        "region": "International",
        "edition": "2018 (Amd 1:2024; revision adds explicit documentation of 6.1.2.2 results)",
        "checked_on": "2026-09-14"
      },
      {
        "code": "Health and Safety at Work Act 2015 (NZ)",
        "title": "Health and Safety at Work Act 2015",
        "access": "public_summary",
        "region": "New Zealand",
        "edition": "as at 5 April 2025",
        "checked_on": "2026-09-14"
      }
    ]
  },
  "description": "Work method statements and construction methodology held as reference for a project.",
  "x-demiton-contract-url": "https://docs.demiton.io/registers/construction_methodology/",
  "x-demiton-register-catalog": "https://docs.demiton.io/concepts/register-catalog"
}