# Open Factory > Research on the equipment that runs factories and datacenters, written for the people who buy it. Open Factory publishes research, lead-time and price data, models and calculators on machinery, electrical gear, power and cooling, with a procurement focus. Open Factory is a research publication on factory and datacenter equipment procurement: lead times, prices, data models and calculators for transformers, switchgear, gensets, chillers, machine tools and the people who buy them. Machine access: JSON API at https://open-factory.com/api/v1/index.json (OpenAPI at https://open-factory.com/api/v1/openapi.json) and an MCP server at https://open-factory.com/mcp (Streamable HTTP, no key needed for the free tools). Docs: https://open-factory.com/developers/ Every article, model and reference page is also served as plain markdown at its URL plus .md (for example https://open-factory.com/articles/transformer-160-weeks.md). Every article opens with a one or two sentence direct answer carrying the headline number and its date. Dated changes: https://open-factory.com/changelog/ ## Models and data - [Book-to-Bill League Table](https://open-factory.com/models/book-to-bill-table/): Quarterly orders, backlog and book-to-bill for every listed electrical, power and cooling OEM, from filings only, with the read-across for buyers: which classes are getting longer and which are clearing. Current headline 3.0x Powell Industries book-to-bill, quarter ended June 30 2026: $934M of orders on $312M of revenue; public reading 3.0x as of 2026-08-03 - [Datacenter MEP Cost Table](https://open-factory.com/models/mep-cost-table/): Capex per MW by component on the Turner & Townsend and JLL baselines, air-cooled and liquid-cooled, with each line's lead time from the Lead-Time Monitor and the carrying cost of delay. Current headline $9.8M per MW all-in datacenter build cost, Phoenix and Columbus, Turner & Townsend Data Centre Construction Cost Index 2025; public reading $9.8M per MW as of 2026-03-13 - [Large-Load Cost Table](https://open-factory.com/models/large-load-cost-table/): What a 50 MW connection costs and takes in 15 US markets: study fees, security per MW, minimum bills, contract terms, exit fees and realistic energization year, from tariffs and dockets. Current headline 2033 realistic energization year for a new 50 MW load in Northern Virginia, Dominion Energy, from a 2026 application; public reading 2033 as of 2026-08-21 - [Lead-Time Monitor](https://open-factory.com/models/lead-time-monitor/): Published lead times for eleven equipment classes compiled from OEM lead-time guides, Census M3 unfilled orders over shipments, ISM supplier deliveries and backlog disclosures in filings. Every cell carries its OEM and date. Current headline 50 weeks LV switchgear, published lead time, Schneider Electric Lead Times Guide, September 2026 edition; public reading 50 weeks as of 2026-09-02 - [OEM Disclosure Scorecard](https://open-factory.com/models/oem-disclosure-scorecard/): Does the OEM publish lead times, list prices, backlog in dollars, capacity in units and delivery performance? Scored from observable facts, source beside every cell, right of reply before publication. Current headline 12 of 90 Cells scored Yes across 18 OEMs and five disclosure criteria, filings and OEM sites checked September 2026; public reading 12 of 90 as of 2026-09-10 - [Public Bid-Tab Price Book](https://open-factory.com/models/bid-tab-price-book/): Transaction prices from public utility, municipal, state and federal procurement awards for transformers, MV switchgear, gensets and chillers, normalized to $/kVA, $/section, $/kW and $/ton bands with n, region and award date. Current headline $69/kVA Pad-mount 3-phase 225 to 500 kVA, median of 60 public awards, 11 buyers in 11 states, 2024 to 2026; public reading $69/kVA as of 2026-08-24 - [Turbine Order Register](https://open-factory.com/models/turbine-order-register/): Every disclosed gas turbine order, slot reservation and framework agreement since 2021, 77 of 127 in the US: buyer, OEM, units, MW, delivery years, terms, and the filing or release that said so, with every later change kept as a dated event. Current headline 127 records Disclosed gas turbine orders, reservations and frameworks on the register, 77 in the US, 207 GW where MW was stated, announced September 2021 to October 2026; public reading 127 records as of 2026-10-20 - [Equipment Price Benchmark](https://open-factory.com/models/equipment-price-benchmark/): Contributed quotes and invoices for machine tools, robots and electrical gear, normalized to spec. Launches as a contribution form and a promise; distributions publish only when a cell has five or more contributors and eight or more quotes. Current headline Contribution form open no distribution is printed until a cell meets the size rules; contributions received so far: none ## Indices - [Book-to-Bill League Table headline](https://open-factory.com/indices/): 3.0x as of 2026-08-03. Powell Industries, quarter ended June 30 2026, orders $934M on revenue $311.7M, reported ratio. Source: Powell Q3 FY2026 earnings release, 8-K Ex. 99.1, filed August 3 2026. Eighteen OEMs in the table; full table is Pro. - [Datacenter MEP Cost Table headline](https://open-factory.com/indices/): $9.8M per MW as of 2026-03-13. All-in build cost, Phoenix and Columbus. Source: Turner & Townsend, Data Centre Construction Cost Index 2025, cost per watt by market; compiled 13 March 2026 for Chillers Are the 60-Week Problem. Component lines are Pro. - [Large-Load Cost Table headline](https://open-factory.com/indices/): 2033 as of 2026-08-21. Realistic energization year for a new 50 MW load, Dominion Energy Virginia. Source: JLL Global Data Center Outlook 2026, p.18 (about seven years to power in Northern Virginia); Dominion queue 70 GW against a 24.6 GW peak, February 2026. Table as of 21 August 2026. - [Lead-Time Monitor headline](https://open-factory.com/indices/): 50 weeks as of 2026-09-02. Low-voltage switchgear (LVDO), made to order. Source: Schneider Electric Lead Times Guide, September 2026 edition, published 2 September 2026. Eleven classes tracked; class detail is Pro. - [OEM Disclosure Scorecard headline](https://open-factory.com/indices/): 12 of 90 as of 2026-09-10. Yes cells across 18 OEMs and five criteria (lead-time guide, list prices, backlog in dollars, capacity in units, delivery performance). Backlog in dollars: 10 of 18 OEMs. No OEM publishes delivery performance. - [Public Bid-Tab Price Book headline](https://open-factory.com/indices/): $69/kVA as of 2026-08-24. Median public award price, pad-mount 3-phase 225 to 500 kVA, n=60, 11 buyers, 11 states, awards 2024-02-06 to 2026-08-24. 2,712 award lines, 51 published bands. Bands free; rows Pro. - [Turbine Order Register headline](https://open-factory.com/indices/): 127 records as of 2026-10-20. Disclosed gas turbine orders, reservations and frameworks since September 2021, 77 of 127 in the US; 207 GW where MW was stated. ## Tools - [Copper and Wire Price Sheet](https://open-factory.com/tools/copper-wire-price-sheet/): Latest copper price to $/ft of metal by NEC conductor size, with an escalation-clause calculator for bids. Status: Live - [Genset TCO](https://open-factory.com/tools/genset-tco/): Ten-year cost of a standby or prime generator set: diesel vs gas vs dual fuel, fuel, maintenance, permitting, Tier 4 aftertreatment, run hours. Status: Live - [Large-Load Interconnection Cost](https://open-factory.com/tools/interconnection-cost/): MW and market to study fees, security deposit, minimum-bill exposure and realistic energization year, from the Large-Load Cost Table. Status: Live - [Lead-Time-Adjusted Schedule](https://open-factory.com/tools/lead-time-schedule/): PO dates and equipment classes in; critical path, temporary-power cost and energization month out, using the Monitor's current published lead times. Status: Live - [PJM Capacity Charge Estimator](https://open-factory.com/tools/pjm-capacity-bill/): Peak load contribution and zone to the annual capacity charge at the 2025/26 to 2028/29 clearing prices, and what ELRP claws back. Status: Live - [Quote Check](https://open-factory.com/tools/quote-check/): Spec in (class, kVA or kW or sections, voltage, region), price band and published lead time out, from the Bid-Tab Price Book and the Lead-Time Monitor, with n and date. Status: Live - [Tariff Exposure Calculator](https://open-factory.com/tools/tariff-exposure-calculator/): HTS code plus country of origin to landed cost under Sections 232 and 301 and the current reciprocal schedule, with the Federal Register or CSMS citation and a checked-on date. Status: Live - [Transformer Sizing and Cost](https://open-factory.com/tools/transformer-sizing-cost/): Load, voltage class and impedance to MVA, price band from the Bid-Tab Price Book and published lead time from the Monitor. Status: Live ## Roadmaps - [Factory Automation Roadmap](https://open-factory.com/roadmaps/automation-roadmap/): PLC lead-time cycles, cobot share, software-defined automation, humanoid pilots graded against buyer economics, and the tariff calendar for machine tools and robots. Last revised 2026-09-10 - [Cooling Roadmap](https://open-factory.com/roadmaps/cooling-roadmap/): Air to direct-to-chip to 600 kW Kyber racks: inlet temperatures, W-series, CDU generations, water, refrigerants, and when chiller capacity arrives. Last revised 2026-09-10 - [Datacenter Electrical Roadmap 2026 to 2032](https://open-factory.com/roadmaps/datacenter-electrical-2026-2032/): Rack density 130 kW to 1 MW, 800 VDC, BESS as UPS, solid-state transformers, prefab e-houses: what ships when, and what it strands. Last revised 2026-09-10 - [Large-Load Policy Tracker by State](https://open-factory.com/roadmaps/large-load-policy-tracker/): Texas SB6 and Batch Zero, AEP Ohio's DCT, Georgia PSC, Virginia GS-5 and the SCC, PJM's backstop, FERC co-location orders: every rule that changes what a 50 to 100 MW connection costs, with the dates that come next. Last revised 2026-09-10 ## Articles - [Dry Cooler or Cooling Tower: What the Water Bill Says in 15 Markets](https://open-factory.com/articles/dry-cooler-vs-tower-water-bill/): A thousand gallons of water and sewer costs $24.80 in Douglas County, Georgia and $8.68 in Baton Rouge as of October 2026, and since a 50 MW open cooling tower needs about 300 million gallons a year, Open Factory's MEP Cost Table puts the gap at $3.6 million a year.. 2026-10-16, Cooling - [Fiber Laser Cutters: What a $500,000 Price Gap Buys](https://open-factory.com/articles/fiber-laser-price-gap/): A Chinese 6 to 12 kW fiber laser sells for $45,000 to $85,000 FOB in December 2025 and lands at about $128,000 after the 41% duty stack, while federal buyers paid $645,000 to $1.75 million in 2025, a $504,000 gap to the cheapest award Open Factory's Equipment Price Benchmark itemizes.. 2026-10-11, Machinery - [Tariffs, September 2026: The Actual Schedule for Machinery and Electrical Gear](https://open-factory.com/articles/tariff-schedule-2026/): As of September 2026 a 2,500 kVA pad-mount transformer pays 25% US duty from every origin and 50% from China, while a low-voltage panel with its PLC pays 0% from Mexico, 10% from Germany, 12.5% from Japan and 40.2% from China, per Open Factory's Tariff Exposure Calculator.. 2026-09-09, Procurement - [SendCutSend: How a Bootstrapped Reno Shop Became a $1 Billion Parts Factory](https://open-factory.com/articles/sendcutsend/): SendCutSend cuts an aluminum bracket in 2 to 4 production days with no minimum quantity, has shipped more than 30 million parts to 300,000 customers from three US plants, and raised $110 million at a $1.01 billion valuation in May 2026. Open Factory's Lead-Time Monitor tracks the turnaround.. 2026-09-05, Procurement - [Modular Is Not Cheaper: A 50 MW Prefab Electrical Room, Line by Line](https://open-factory.com/articles/skids-vs-stick-built/): A prefabricated electrical room for a 50 MW datacenter is not cheaper: Open Factory's Datacenter MEP Cost Table lands the skid route at $3.51M per MW against $3.47M stick-built, 1% more, but 27 weeks faster at 95 weeks from power-block PO to energization against 122, as of August 2026.. 2026-09-04, Electrical - [The Recommended Spares List Is Where the Margin Hides](https://open-factory.com/articles/recommended-spares-margin/): On public awards Open Factory can read, the spares line is 0.8% of a transformer award, 2% of a genset and 20% of a breaker buy, and the City of Ocala paid $40,197.50 per ABB R-Mag breaker in November 2023 and $44,499.75 in November 2025 with no second quote.. 2026-08-22, Procurement - [800 VDC Will Strand Your White-Space Frame Agreement](https://open-factory.com/articles/800vdc-strands-frame-agreements/): NVIDIA set a ship date for 800 VDC on August 11, 2026, with the MGX power rack due in the second half of 2026. Open Factory finds a five-year 415 V UPS and AC busway frame agreement puts 40 to 60% of its dollars into superseded SKUs.. 2026-08-21, Electrical - [What 50 MW Costs in 15 US Markets](https://open-factory.com/articles/what-50mw-costs-15-markets/): A 50 MW connection requested in Northern Virginia in 2026 energizes in 2033 after $75 million of collateral and a 14 year contract, while the same 50 MW in Houston posts no rule-mandated security and can be live in 2028, per Open Factory's Large-Load Cost Table as of August 2026.. 2026-08-21, Power - [Liquidated Damages at 0.5% a Week: Why Caps Sit at the Vendor's Margin](https://open-factory.com/articles/liquidated-damages/): Liquidated damages in public transformer, switchgear and genset contracts run about 0.5% of price a week, capped at 5%, so as of July 2026 a week of delay on a 50 MW datacenter hall costs about $2.7 million against $74,000 of LDs, per Open Factory's Large-Load Cost Table.. 2026-07-20, Procurement - [How to Write an RFQ for Capital Equipment in 2026](https://open-factory.com/articles/rfq-capital-equipment/): An equipment RFQ in 2026 has to settle escalators, LDs, milestones and tariff refunds: the City of Ocala agreed $8,070,340 for two 105 MVA autotransformers in August 2023 and approved $9,170,340 for the same units on April 28, 2026, a $1.1 million PPI escalator, per Open Factory's Bid-Tab Price Book.. 2026-07-14, Procurement - [The 2% Funnel: 474 GW Requested, 9 GW Approved, 5.8 GW Energized in ERCOT](https://open-factory.com/articles/ercot-funnel/): Texas had about 474 GW of large-load interconnection requests as of August 2026, and ERCOT's March 26, 2026 status table shows 9.0 GW approved to energize and 5.8 GW energized, so about 2% has permission to draw power, as tracked in Open Factory's Large-Load Cost Table.. 2026-07-08, Power - [CloudNC and Limitless Labs: AI Is Coming for the CNC Programming Bottleneck](https://open-factory.com/articles/cloudnc-limitless-labs/): CloudNC and Limitless Labs raised $40 million between them from 16 June to 8 September 2026 to automate CNC programming for the 4,790 CNC tool programmers in America's 16,619 machine shops, and Open Factory's seat math shows a 50% CAM cut returns about $22,139 a year per programmer.. 2026-07-01, Machinery - [The R-454B Summer: What the Refrigerant Switch Did to Chiller Prices](https://open-factory.com/articles/refrigerant-transition-prices/): A 20 lb cylinder of R-454B cost $345 in 2021 and $700 to $2,000 in July and August 2025, the switch raised Carrier chiller list prices 10% in March 2024 and March 2025, and Open Factory finds the 563 lb charge in a 500-ton chiller is 1.2% of the machine.. 2026-06-30, Cooling - [OFCI vs Design-Build: How Hyperscalers Buy Chillers and Colo Developers Do Not](https://open-factory.com/articles/ofci-vs-design-build-chillers/): Owner-furnished, contractor-installed chillers and CDUs for a 20 MW liquid-cooled hall cost $27.9 million against $32.8 million through the mechanical subcontract, a saving of $4.9 million or 14.9%, because OFCI strips a 15% subcontractor markup and 10% GC fee, per Open Factory's Datacenter MEP Cost Table as of June 2026.. 2026-06-26, Cooling - [Grainger's 2017 Confession: The Year a Distributor Admitted Its List Prices Were Fiction](https://open-factory.com/articles/grainger-confession/): On April 18, 2017, W.W. Grainger told investors its first quarter fell short because customers responded to across-the-board list price cuts and new web prices on about 450,000 SKUs, and US gross margin fell 1.7 points in one quarter, a reset Open Factory's Bid-Tab Price Book traces through 2026.. 2026-06-21, Procurement - [Reading a Switchgear Quote: The Eleven Line Items That Hide the Schedule](https://open-factory.com/articles/switchgear-quote-anatomy/): A medium-voltage switchgear quote has eleven line items and four of them move the delivery date more than the price. Riverside Public Utilities paid $2,561,551.88 for one 15 kV metal-clad lineup in June 2024 and it was still in the factory eighteen months later, per Open Factory's Bid-Tab Price Book.. 2026-06-13, Procurement - [1,250 Hours: Reading BMW's Humanoid Pilot as a Buyer](https://open-factory.com/articles/humanoid-pilot-as-buyer/): BMW's Figure 02 humanoid pilot delivered about 1,250 operating hours in ten months at Spartanburg in 2025, or 0.6 of one worker's year, moving more than 90,000 sheet-metal parts, and it is the only pilot with a disclosed runtime among the nine Open Factory's OEM Disclosure Scorecard scores.. 2026-06-10, Machinery - [The $306k Machine: A Record Half-Year With Fewer Units](https://open-factory.com/articles/machine-tool-record-fewer-units/): US manufacturers ordered a record $3.44 billion of metalworking machinery in the first half of 2026 on 11,243 machines, 2.6% fewer than in the second half of 2025, so the average order rose to about $306,000 from $277,000, as tracked in Open Factory's Bid-Tab Price Book.. 2026-05-25, Machinery - [From 36 Weeks to Stock: The ControlLogix Lead-Time Cycle](https://open-factory.com/articles/controllogix-36-weeks-to-stock/): Rockwell's own bulletin listed a ControlLogix 5580 controller at 35 calendar days on September 22, 2021 and 208 days on October 26, 2022, and Open Factory's Lead-Time Monitor, which holds eleven editions of that bulletin, now reads the PLC line at stock.. 2026-05-17, Machinery - [Grainger vs McMaster vs Amazon Business: A 50-SKU Price Basket](https://open-factory.com/articles/mro-price-basket/): Open Factory priced the same 50 MRO items at six distributors on 10 September 2026: Fastenal's median web price was 126% above the cheapest storefront, McMaster-Carr's was 37% above, and Amazon Business was the floor, cheapest on 34 of 48 SKUs with a comparison.. 2026-05-14, Procurement - [A Factory Owner's Guide to the PJM Capacity Charge](https://open-factory.com/articles/pjm-capacity-factory-bill/): PJM's RTO capacity clearing price rose from $28.92 to $329.17 per MW-day in two auctions, so a 5 MW plant in Met-Ed territory pays about $568,000 for capacity in the delivery year starting June 1, 2026 against about $50,000 in 2024, per Open Factory's PJM Capacity Charge Estimator.. 2026-05-08, Power - [A Robot Costs $61k. The Cell Costs $150k](https://open-factory.com/articles/robot-61k-cell-150k/): North American buyers paid $61,198 per robot arm in 2025, but a working cell costs 1.9 to 2.4 times that, $113,336 to $144,432 for three common cobot cells priced line by line in Open Factory's Bid-Tab Price Book as of September 2026.. 2026-05-08, Machinery - [The $60 Million Deposit: How Equipment Slots Became Datacenter Currency](https://open-factory.com/articles/slot-economy/): One slot for a 384 MW GE Vernova 7HA.02 turbine takes a $60 million reservation payment, 20% of a $300 million machine. GE Vernova ended June 2026 with 116 GW under contract, 63 GW as slot reservations, and $25.8 billion paid in advance, which Open Factory's MEP Cost Table carries.. 2026-05-08, Power - [Who Gets the IEEPA Refund](https://open-factory.com/articles/ieepa-refund-fight/): The IEEPA refund goes to the importer of record, not the buyer who paid a surcharge, and CBP puts the pool at about $166 billion across 53 million entries and 330,000 importers as of March 2026. Open Factory's Tariff Exposure Calculator flags the refundable lines on every 2025 entry.. 2026-04-29, Procurement - [Behind the Meter, In Front of the Queue: 90 GW Announced, 2 GW Running](https://open-factory.com/articles/behind-meter-90gw/): Datacenter developers have announced about 90 GW of behind-the-meter generation across 59 US projects and about 2 GW of it runs, or 2.2%, while EIA's July 2026 inventory lists 68.1 GW of planned gas nationwide. Open Factory's Lead-Time Monitor forecasts what energizes by the end of 2028.. 2026-04-28, Power - [Compressed Air Is 10% of Your Factory's Power Bill](https://open-factory.com/articles/compressed-air-10-percent/): Compressed air takes about 10% of a typical plant's electricity by DOE's count, and a 200 hp rotary screw compressor running 6,000 hours a year at the 2025 US industrial rate of 8.62 cents per kWh costs about $70,000 a year. Open Factory finds a leak program worth $83,000.. 2026-04-23, Cooling - [Five Majors Bought Their Way Into Liquid Cooling. Here Is the Price List](https://open-factory.com/articles/cooling-ma-price-list/): Five majors paid $16.3 billion of disclosed prices for liquid cooling companies in seventeen months, with Ecolab buying CoolIT for $4.75 billion at 29 times EBITDA on March 20, 2026 and Eaton closing Boyd Thermal at $9.5 billion and 22.5 times, per Open Factory's deal table.. 2026-04-19, Cooling - [Recips vs Turbines vs Fuel Cells for a 100 MW Bridge](https://open-factory.com/articles/turbines-recips-fuel-cells/): A 100 MW bridge plant over five years costs $96 per MWh on solid oxide fuel cells, $104 on gas reciprocating engines and $112 on aeroderivative gas turbines at 85% utilization and $3.78/MMBtu, with first power in 17, 27 and 30 months, per Open Factory's MEP Cost Table in 2026.. 2026-03-24, Power - [Nox Metals: The Detroit Startup Cutting Aluminum Plate in 36 Hours](https://open-factory.com/articles/nox-metals/): Nox Metals quotes saw-cut aluminum plate instantly and delivers in an average of 36 hours, against the 3 to 5 days a typical service center takes to quote, after an $11.5 million seed on 14 June 2026, and Open Factory's Lead-Time Monitor lists cut plate as its first raw material.. 2026-03-18, Procurement - [The 2 MW Plant Service Upgrade Nobody Budgets Right](https://open-factory.com/articles/2mw-plant-service-upgrade/): A 400-person plant adding 2 MW of service pays $400k to $1.2M for the items the switchgear quote omits, and with the utility-owned pad-mount at 52 to 104 weeks the crane lands in week 74. Open Factory's Large-Load Cost Table shows the sequencing that pulls energization forward by 20 weeks.. 2026-03-15, Electrical - [Chillers Are the 60-Week Problem](https://open-factory.com/articles/chiller-60-week-problem/): A water-cooled chiller over 1,000 tons quotes at 50 to 70 weeks in the United States as of May 22, 2026, an air-cooled machine over 500 tons at 40 to 60 weeks, and Census M3 puts HVAC unfilled orders at $18.6 billion in July 2026, per Open Factory's Lead-Time Monitor.. 2026-03-13, Cooling - [What a Haas VF-2 Really Costs in 2026](https://open-factory.com/articles/haas-vf2-true-cost/): A new Haas VF-2 lists at $70,995, which is 35% of the roughly $172,523 net ten-year bill for a one-shift job shop once maintenance, one spindle, power, coolant and cutting tools are added, per Open Factory's Bid-Tab Price Book worked example as of September 2026.. 2026-03-13, Machinery - [What 2,439 Public Change Orders Show About Electrical and Mechanical Contractors](https://open-factory.com/articles/change-orders-212-invoices/): Across 1,096 federal electrical and mechanical construction contracts awarded in fiscal years 2019 to 2024, with 2,439 priced change orders, the median contract closed 1.8% above its award price and the dollars closed 9.5% above it. Open Factory's Public Bid-Tab Price Book holds the full dataset.. 2026-03-04, Procurement - [Copper at $6.77: How a 50% Tariff Shows Up in a 200-Amp Panel](https://open-factory.com/articles/copper-tariff-panel/): COMEX copper set a record $6.77 per pound on August 7, 2026, and Open Factory's panel math shows a 200-amp residential service that carried $270 of copper at 2024 prices now carries $440, about $30 of it the tariff expectation priced into COMEX.. 2026-02-14, Procurement - [The Used and Refurbished Market Nobody Indexes](https://open-factory.com/articles/used-refurbished-market/): Fifteen vendors bid $41,200 to $101,253 on one 2,500 kVA pad-mount transformer for Fayetteville's public utility in September 2025, a 2.5x spread at 10 to 35 week lead times, and a dealer shipping from stock lists it at $104,000, 1.77x the median bid, per Open Factory's Bid-Tab Price Book.. 2026-02-04, Procurement - [1872, Foundational Industries and Hadrian: Three Blueprints for the Autonomous American Factory](https://open-factory.com/articles/1872-foundational-industries-hadrian/): Between July 2025 and August 2026, 1872, Foundational Industries and Hadrian raised $1.41 billion to build autonomous American factories: $15 million, $25 million and $1.37 billion respectively, with Hadrian's four plants totalling just under 3 million square feet. Open Factory's Lead-Time Monitor will track each one's delivered lead time.. 2026-01-11, Machinery - [Japan Is Eating the US Capex Boom](https://open-factory.com/articles/japan-eats-capex-boom/): Japanese machine tool builders booked JPY 40.65 billion of North American orders in June 2026, up 44% from June 2025, and in the first half of 2026 US buyers sent them $1.29 billion of the $3.44 billion placed for metalworking machinery, 37 cents of every dollar, by Open Factory's arithmetic.. 2026-01-11, Machinery - [Who Bought the EV Plants' Machines](https://open-factory.com/articles/ev-plant-machines-second-hand/): Companies cancelled, closed or downsized 61 US clean-energy projects worth $34.8 billion in 2025, but most was never built, and the EV plant machines that did reach the secondary market sold at 3% to 37% of reference value in the court records Open Factory read.. 2026-01-10, Machinery - [When a Megapack Beats a Static UPS](https://open-factory.com/articles/bess-as-ups/): A 24 MW, 48 MWh block of twelve Tesla Megapack 2 XL units costs about $14.4 million installed at January 2026 prices, $10.1 million after the 30% storage credit, against about $17.5 million for the N+1 static UPS in a 20 MW hall, per Open Factory's Datacenter MEP Cost Table.. 2026-01-08, Electrical - [The OEM Disclosure Scorecard: Who Tells Buyers Anything](https://open-factory.com/articles/oem-disclosure-scorecard/): Open Factory's OEM Disclosure Scorecard version 0.1 finds that the eighteen largest electrical, power and cooling OEMs publish only 12 of 90 cells a buyer needs, with 16 Partials and 62 Noes: GE Vernova alone scores 2 of 5, ten score 1 and seven score 0, as of September 2026.. 2025-12-23, Electrical - [Rockwell's 250 Basis Points: How Tariffs Show Up in Your PLC Quote](https://open-factory.com/articles/rockwell-250bps/): Tariffs are 100 basis points of a Rockwell Automation bill in fiscal 2026, inside the 250 basis points of total price the company guided on its August 4, 2026 call, and Open Factory's Bid-Tab Price Book tracks the pass-through against the 150 basis points of underlying price.. 2025-12-19, Procurement - [What Hyperscaler Nuclear PPAs Tell a Factory Negotiating a 15-Year Contract](https://open-factory.com/articles/nuclear-ppas-price-signal/): Microsoft pays about $112 per MWh for 835 MW from the Crane nuclear restart on a 20-year contract, a 70 to 90% premium to wholesale, so Open Factory's Large-Load Cost Table treats that as the reference price for a 15-year factory power contract as of December 2025.. 2025-12-18, Power - [Datacenter Construction Is Eating Your Electricians](https://open-factory.com/articles/electricians-wages-by-metro/): Loudoun County electrical contractor payrolls rose 138% from 5,615 people in 2019 to 14,022 in March 2026, while the national BLS median electrician wage rose 12.5% against 25.6% CPI from May 2019 to May 2025, per Open Factory's Large-Load Cost Table.. 2025-12-01, Procurement - [Why Your Switchgear Costs 50% More Than in 2021](https://open-factory.com/articles/switchgear-50-percent/): The BLS producer price index for switchgear stood at 394.8 in July 2026, 78% above January 2021, and medium-voltage switchgear is up 50% since 2021 per Wood Mackenzie. Open Factory's decomposition finds inputs explain 36 of the 78 points and margin the other 43.. 2025-11-30, Electrical - [The 30% Fuel-Cell ITC Is the Last Federal Subsidy for On-Site Power](https://open-factory.com/articles/fuel-cell-itc-last-subsidy/): Since July 4, 2025, the 30% federal investment credit survives only for fuel cells among gas-fired on-site power, with wind and solar needing construction by July 4, 2026 and gas CHP getting nothing, and Open Factory's math turns a 2.5-year payback at $210/MWh in California into 1.7 years.. 2025-11-29, Power - [Vertiv Stopped Reporting Its Backlog. Here Is Our Estimate](https://open-factory.com/articles/vertiv-backlog-estimate/): Open Factory estimates Vertiv's unpublished order backlog at $16 to $20 billion at June 30, 2026, central case about $17.4 billion, up from the last reported $15.0 billion at December 31, 2025, with current deferred revenue doubling from $1.81 billion to $3.63 billion in six months.. 2025-11-11, Electrical - [Transformer Lead Times Hit 143 Weeks: Who Gets Delivered First](https://open-factory.com/articles/transformer-160-weeks/): A generator step-up transformer ordered in the United States was quoted at 143 weeks in the second quarter of 2025, a substation power transformer at 128 weeks and medium-voltage switchgear at 44, per Wood Mackenzie, against about 50 weeks in 2021, and Open Factory's Lead-Time Monitor lists both readings.. 2025-10-25, Electrical - [Quote Check: What Your Switchgear Quote Should Have Said](https://open-factory.com/articles/quote-check-launch/): Open Factory's Quote Check tool places a switchgear quote against public awards: Riverside Public Utilities paid $2,254,387.50 for a 15 kV metal-clad lineup in May 2025, 52% above the $1,481,321 median of 12 public awards dated December 2016 to May 2025 in the Public Bid-Tab Price Book.. 2025-10-18, Procurement - [One Steel Mill Gates Every US Transformer](https://open-factory.com/articles/butler-works-goes/): Every pound of domestic grain-oriented electrical steel in a US transformer core is melted at Cleveland-Cliffs Butler Works, a plant with a 920 mm maximum coil width, and the transformer PPI is up 91% since December 2019 at 381.8 in July 2026, per Open Factory's Lead-Time Monitor.. 2025-10-12, Electrical - [MES Is a Consulting Product](https://open-factory.com/articles/mes-is-consulting/): The Bureau of Engraving and Printing has paid $110.1 million for MES support services since May 2021 against $4.64 million of Oracle licences in FY2025, about five dollars of consulting per dollar of software, the pattern Open Factory found across 44 public MES and SCADA awards as of October 2025.. 2025-10-10, Machinery - [Tariff Bill of Materials: What Sections 232 and 301 Add to a UPS, a Lineup, a Genset and a Megapack](https://open-factory.com/articles/tariff-bom-electrical/): A 1 MW UPS assembled in the United States carries about 17 points of duty and the same UPS imported from China carries 55, under the tariff stack in force on October 10, 2025. The 50% copper tariff is 3.8 of those 17 points, per Open Factory's Tariff Exposure Calculator.. 2025-10-10, Procurement - [The Copper and Wire Price Sheet, Weekly](https://open-factory.com/articles/copper-wire-sheet-launch/): Open Factory's Copper and Wire Price Sheet, refreshed every Monday, prices a foot of 500 kcmil copper at $9.48 of metal at the IMF's $6.14 a pound for July 2026, or $9.70 at that month's $6.28 COMEX open, with a price per foot for 13 conductor sizes.. 2025-10-02, Procurement - [Introducing the Large-Load Cost Table: 15 Markets Side by Side](https://open-factory.com/articles/large-load-cost-table-launch/): Open Factory's Large-Load Cost Table, version 0.1, compares a 50 MW connection across 15 US utilities on eight tariff cells each: 53 of the 120 cells come from primary documents, 20 from trade press, 2 from arithmetic, and 45 are not published anywhere, as of August 2026.. 2025-10-01, Power - [The $2,850 Report That Says Nothing](https://open-factory.com/articles/2850-report-says-nothing/): IBISWorld's $2,850 ProcurementIQ switchgear report prices the whole category at one $37,300 benchmark, while the 118 public awards in Open Factory's Public Bid-Tab Price Book run from $12,492 for a pad-mount switch in 2019 to $3,827,000 for a 34.5 kV lineup in September 2024.. 2025-09-29, Procurement - [Building the Missing Index: Realized Auction Prices for Used CNC Machines](https://open-factory.com/articles/used-cnc-auction-index/): Used CNC machines lose about half their hammer value every 3.9 years, based on 144 realized auction lots from June 2023 to September 2026 in Open Factory's Bid-Tab Price Book, and a five-year-old Haas VF-2SS hammered at $36,600 in November 2025, 43.6% of its $83,995 list price.. 2025-09-25, Machinery - [Introducing the Public Bid-Tab Price Book](https://open-factory.com/articles/bid-tab-price-book-launch/): Open Factory's Public Bid-Tab Price Book launches as version 0.1 with 2,712 public award lines and 51 price bands, and across 297 lines dated January 2024 to August 2026 the median three-phase pad-mount price runs from $153 per kVA at 75 to 167 kVA to $30 at 1,500 to 2,500.. 2025-09-20, Procurement - [Cummins and Caterpillar Are Sold Out Through 2028](https://open-factory.com/articles/gensets-sold-out-2028/): Cummins is taking generator orders well into 2028 and Caterpillar closed June 2026 with $72.1 billion of firm backlog, and Open Factory's Lead-Time Monitor shows published lead times of 50 to 66 weeks for a 1,500 to 2,000 kW diesel genset and 90 to 110 weeks above 3,500 kW.. 2025-09-15, Electrical - [The 171-Day Capex Lead Time: ISM's Most Ignored Table](https://open-factory.com/articles/171-day-capex-lead-time/): The average US manufacturing buyer commits to capital equipment 171 days ahead of need in the August 2026 ISM report, with 27% committing more than a year out, against 147 days in December 2019. Open Factory's Lead-Time Monitor rebuilds the series back to 2007.. 2025-09-13, Procurement - [Book-to-Bill League Table, Q2 2026: Every Electrical OEM](https://open-factory.com/articles/book-to-bill-league/): Powell Industries posted a book-to-bill of 3.0 in the quarter to June 30 2026, booking $934 million of switchgear orders against $312 million shipped, and all eight electrical OEMs that print a ratio sit above 1.0, down to Eaton at 1.2, in Open Factory's Book-to-Bill League Table.. 2025-09-10, Electrical - [Introducing the Open Factory Lead-Time Monitor](https://open-factory.com/articles/lead-time-monitor-launch/): Schneider Electric quotes low-voltage switchgear at 50 weeks from release to manufacturing in its September 2026 Lead Times Guide, and Open Factory's Lead-Time Monitor, launched as version 0.1, puts all eleven equipment classes in one table, of which only four have an OEM-published lead time.. 2025-09-10, Electrical ## Lead times by equipment class - [Power transformer, 5 MVA and up lead time: 128 weeks](https://open-factory.com/lead-times/power-transformer/): Power transformer, 5 MVA and up is quoted at 128 weeks, per Wood Mackenzie T&D supply chain note, Oct 15 2025 (as reported). Average quoted lead time, Q2 2025; 2024 range 80 to 210 weeks for large units. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Generator step-up transformer lead time: 143 weeks](https://open-factory.com/lead-times/gsu-transformer/): Generator step-up transformer is quoted at 143 weeks, per Wood Mackenzie T&D supply chain note, Oct 15 2025 (as reported). Average quoted lead time, Q2 2025. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [MV switchgear lead time: 44 weeks](https://open-factory.com/lead-times/mv-switchgear-avg/): MV switchgear is quoted at 44 weeks, per Wood Mackenzie T&D supply chain note, Oct 15 2025 (as reported). Average quoted lead time, Q2 2025. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Distribution and pad-mount transformer lead time: 104 or more weeks](https://open-factory.com/lead-times/pad-mount-transformer/): Distribution and pad-mount transformer is quoted at 104 or more weeks, per NRECA coalition letter, Jan 4 2024. "More than two years" per the NRECA coalition letter of Jan 4 2024; Wood Mackenzie reported pad-mount lead times still rising in Q2 2025. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [LV switchboard lead time: 18 to 34 weeks](https://open-factory.com/lead-times/switchboard/): LV switchboard is quoted at 18 to 34 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 6 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [LV switchgear, drawout lead time: 45 to 50 weeks](https://open-factory.com/lead-times/lv-switchgear/): LV switchgear, drawout is quoted at 45 to 50 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 6 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [MV switchgear lead time: 15 to more than 40 weeks](https://open-factory.com/lead-times/mv-switchgear-oem/): MV switchgear is quoted at 15 to more than 40 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 7 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Motor control center lead time: 6 to 27 weeks](https://open-factory.com/lead-times/mcc/): Motor control center is quoted at 6 to 27 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 11 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Busway lead time: 24 to 40 weeks](https://open-factory.com/lead-times/busway/): Busway is quoted at 24 to 40 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 2 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [LV dry-type transformer to 300 kVA+ lead time: 4 to 9 weeks](https://open-factory.com/lead-times/lv-dry-transformer/): LV dry-type transformer to 300 kVA+ is quoted at 4 to 9 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 13 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Automatic transfer switch lead time: 6 to 27 weeks](https://open-factory.com/lead-times/ats/): Automatic transfer switch is quoted at 6 to 27 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 11 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Power control system, LV lead time: 32 weeks](https://open-factory.com/lead-times/pcs-lv/): Power control system, LV is quoted at 32 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 1 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Power control system, MV lead time: 50 weeks](https://open-factory.com/lead-times/pcs-mv/): Power control system, MV is quoted at 50 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 1 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Power panelboard, I-Line assembled lead time: 14 to 19 weeks](https://open-factory.com/lead-times/power-panelboard/): Power panelboard, I-Line assembled is quoted at 14 to 19 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 4 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [LV power circuit breaker, MTZ/NW/P/R frames lead time: 20 to 24 weeks](https://open-factory.com/lead-times/lv-power-breaker/): LV power circuit breaker, MTZ/NW/P/R frames is quoted at 20 to 24 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 5 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Variable speed drives and soft starters lead time: 4 to 32 weeks](https://open-factory.com/lead-times/drives/): Variable speed drives and soft starters is quoted at 4 to 32 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 8 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset 500 to 1000 kW, diesel lead time: 32 to 48 weeks](https://open-factory.com/lead-times/genset-500-to-1000-kw/): Genset 500 to 1000 kW, diesel is quoted at 32 to 48 weeks, per Terrapin Construction Group (June 10, 2026). Terrapin Construction Group (GC slot reservations). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset 1500 to 2000 kW, diesel lead time: 50 to 66 weeks](https://open-factory.com/lead-times/genset-1500-to-2000-kw/): Genset 1500 to 2000 kW, diesel is quoted at 50 to 66 weeks, per Terrapin Construction Group (June 10, 2026). Terrapin Construction Group (GC slot reservations). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset 2500 to 3500 kW, diesel lead time: 62 to 82 weeks](https://open-factory.com/lead-times/genset-2500-to-3500-kw/): Genset 2500 to 3500 kW, diesel is quoted at 62 to 82 weeks, per Terrapin Construction Group (June 10, 2026). Terrapin Construction Group (GC slot reservations). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset 3500 to 4500 kW, diesel lead time: 90 to 110 weeks](https://open-factory.com/lead-times/genset-3500-to-4500-kw/): Genset 3500 to 4500 kW, diesel is quoted at 90 to 110 weeks, per Terrapin Construction Group (June 10, 2026). Terrapin Construction Group (GC slot reservations). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset 1000 to 3000 kW, natural gas lead time: 54 to 78 weeks](https://open-factory.com/lead-times/genset-1000-to-3000-kw-gas/): Genset 1000 to 3000 kW, natural gas is quoted at 54 to 78 weeks, per Terrapin Construction Group (June 10, 2026). Terrapin Construction Group (GC slot reservations). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Genset High-horsepower data center gensets lead time: 78 to 104 weeks](https://open-factory.com/lead-times/genset-high-horsepower-data-center-gensets-qsk95-class/): Genset High-horsepower data center gensets is quoted at 78 to 104 weeks, per Cummins 10-K FY2025 (February 10, 2026). Cummins 10-K FY2025 (strong demand for our data center products extending out six to eight quarters). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. - [Automatic transfer switch, large lead time: 24 to 40 weeks](https://open-factory.com/lead-times/genset-automatic-transfer-switch-large/): Automatic transfer switch, large is quoted at 24 to 40 weeks, per Terrapin (June 10, 2026). Terrapin (24 to 40) and Central States Diesel (20 to 40). Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026. ## Prices by equipment class - [Distribution transformer, liquid-filled: what public buyers paid, medians $27.92 to $267.73 per kVA](https://open-factory.com/prices/pad-mount-transformer/): For Distribution transformer, liquid-filled, public buyers paid medians from $27.92 to $267.73 per kVA across 15 published bands (413 awards, January 2020 to August 2026); the largest band, pad-mount 1ph 75 to 167 kVA, has a median $88.93 with the middle half of awards between $61.60 and $93.60. Open Factory's Public Bid-Tab Price Book, as of September 1, 2026. - [Substation or power transformer, per unit: what public buyers paid, median $2,132,514 per unit](https://open-factory.com/prices/substation-transformer/): Public buyers paid a median $2,132,514 per unit (6 awards, March 2024 to August 2026, 34.5 to 99 kV class (69 kV typical), per unit) for Substation or power transformer, per unit, with the middle half of awards between $1,931,467 and $2,897,924. Open Factory's Public Bid-Tab Price Book publishes one band for this class as of September 1, 2026. - [MV switchgear, per lineup or unit: what public buyers paid, medians $73,715 to $2,019,662 per unit](https://open-factory.com/prices/mv-switchgear/): For MV switchgear, per lineup or unit, public buyers paid medians from $73,715 to $2,019,662 per unit across 3 published bands (40 awards, April 2024 to August 2026); the largest band, pad-mounted switchgear / switch 15 to 38 kV, per unit, has a median $73,715 with the middle half of awards between $28,131 and $128,557. Open Factory's Public Bid-Tab Price Book, as of September 1, 2026. - [Generator set: what public buyers paid, medians $335 to $1,025 per kW](https://open-factory.com/prices/diesel-genset/): For Generator set, public buyers paid medians from $335 to $1,025 per kW across 5 published bands (82 awards, April 2019 to August 2026); the largest band, stationary 20 to 249 kW, has a median $760 with the middle half of awards between $516 and $1,116. Open Factory's Public Bid-Tab Price Book, as of September 1, 2026. - [Chiller: what public buyers paid, medians $1,150 to $2,308 per ton](https://open-factory.com/prices/chiller/): For Chiller, public buyers paid medians from $1,150 to $2,308 per ton across 5 published bands (48 awards, December 2018 to May 2026); the largest band, type unstated 100 to 299 tons, has a median $1,876 with the middle half of awards between $1,162 and $2,190. Open Factory's Public Bid-Tab Price Book, as of September 1, 2026. ## Large-load power by market - [Northern Virginia: what a 50 MW connection costs under Dominion Energy Virginia](https://open-factory.com/power/northern-virginia/): In Northern Virginia, Dominion Energy Virginia connects a 50 MW load under Schedule GS-5 (large-load class) plus SCC-ordered mandatory CIAC for direct-connect transmission, docket PUR-2025-00058 (GS-5 approved 2025-11-25). Minimum bill: 85% of contract demand for distribution and transmission; 60% for generation. Term: 14 years. Realistic energization: 2033. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Columbus: what a 50 MW connection costs under AEP Ohio](https://open-factory.com/power/columbus/): In Columbus, AEP Ohio connects a 50 MW load under Schedule DCT (Data Center Tariff), docket PUCO 24-508-EL-ATA (approved 2025-07-09). Minimum bill: 15,000 kW plus 85% of contract capacity above 25,000 kW, capped at 85%. Term: ramp (max 4 years) plus 8 years = up to 12 years. Realistic energization: 2031 to 2033. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Atlanta: what a 50 MW connection costs under Georgia Power](https://open-factory.com/power/atlanta/): In Atlanta, Georgia Power connects a 50 MW load under PSC large-load rule for customers at or above 100 MW; TOU-SC-16 customer-specific pricing; standard tariffs below 100 MW, docket Georgia PSC rule adopted 2025-01-23 (effective 2025-02-01) under docket 55378. Minimum billing requirements for 100 MW+ contracts (level customer-specific). Term: up to 15 years for 100 MW+ (was 5). Realistic energization: 2031. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Dallas-Fort Worth: what a 50 MW connection costs under Oncor Electric Delivery](https://open-factory.com/power/dallas-fort-worth/): In Dallas-Fort Worth, Oncor Electric Delivery connects a 50 MW load under SB 6 (75 MW+) and PUCT proposed 16 TAC 25.194; ERCOT Batch Zero (NPRR1325/PGRR145); standard TDSP facilities extension below 75 MW, docket PUCT Project 58481 (proposed rule published 2026-03-12; comments due 2026-04-17). Minimum bill: none (retail energy is bought from a REP; TDSP delivery charges follow 4CP demand). Term: none. Realistic energization: 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Houston: what a 50 MW connection costs under CenterPoint Energy Houston Electric](https://open-factory.com/power/houston/): In Houston, CenterPoint Energy Houston Electric connects a 50 MW load under same ERCOT/PUCT regime as Oncor; facility extension agreements with deposits below 75 MW, docket PUCT Project 58481. Minimum bill: none. Term: none. Realistic energization: 2028 to 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [West and South Texas: what a 50 MW connection costs under AEP Texas](https://open-factory.com/power/west-and-south-texas/): In West and South Texas, AEP Texas connects a 50 MW load under same ERCOT/PUCT regime as Oncor, docket PUCT Project 58481. Minimum bill: none by rule (AEP cites take-or-pay ESAs for its vertically integrated utilities; AEP Texas is wires-only). Term: none by rule. Realistic energization: 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Carolinas: what a 50 MW connection costs under Duke Energy Carolinas](https://open-factory.com/power/carolinas/): In Carolinas, Duke Energy Carolinas connects a 50 MW load under Schedule HLF (High Load Factor) large-load provisions proposed in the 2026 rate case; existing contracts with minimum demand and credit support, docket NCUC E-7 Sub 1329 (filed late June 2026; pending). Minimum bill: 75% of contracted demand. Term: 10 or 15 years depending on load size. Realistic energization: 2029 to 2030. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Phoenix (APS): what a 50 MW connection costs under Arizona Public Service](https://open-factory.com/power/phoenix-aps/): In Phoenix (APS), Arizona Public Service connects a 50 MW load under Extra High Load Factor (XHLF) rate update with minimum bill and collateral; long-term contracts with upfront contributions, docket ACC E-01345A-25-0105 (June 2025 rate case; pending). Minimum bill (level not public). Term: long-term contracts (length not public). Realistic energization: 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Phoenix (SRP): what a 50 MW connection costs under Salt River Project](https://open-factory.com/power/phoenix-srp/): In Phoenix (SRP), Salt River Project connects a 50 MW load under E-67 price plan (board-approved in the 2025 pricing process) and the Large Customer Integration Process (LCIP), docket SRP board pricing process 2025 (LBNL lists E-00000A-25-0069). Minimum bill: greater of actual use or 80% of forecasted demand (SRP may reduce if the customer pays for generation and infrastructure SRP would not otherwise build). Term: not published. Realistic energization: 2028 to 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Salt Lake City: what a 50 MW connection costs under PacifiCorp / Rocky Mountain Power](https://open-factory.com/power/salt-lake-city/): In Salt Lake City, PacifiCorp / Rocky Mountain Power connects a 50 MW load under Utah SB 132 (2025) large-load pathways; Large-Load Service Contract approved by Utah PSC; Oregon Schedule 401 pending under HB 3546, docket Utah PSC 26-035-05 (approved). Minimum bill: not published. Term: not published. Realistic energization: 2028 to 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Louisiana: what a 50 MW connection costs under Entergy Louisiana](https://open-factory.com/power/louisiana/): In Louisiana, Entergy Louisiana connects a 50 MW load under Large Load High Load Factor Power Service rate; customer-specific contracts for hyperscale loads (Meta), docket LPSC U-36959 (approved). Minimum charges in the Meta contract cover capital cost return fixed O&M taxes and insurance. Term: 5-year minimum contract under the tariff. Realistic energization: 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Colorado: what a 50 MW connection costs under Xcel Energy (Public Service Co. of Colorado)](https://open-factory.com/power/colorado/): In Colorado, Xcel Energy (Public Service Co. of Colorado) connects a 50 MW load under Large General Service - Transmission large-load tariff (proposed), docket CPUC 26AL-0137E (filed 2026-04-02; pending). Minimum bill: 80% of contracted power over the term plus a minimum monthly bill. Term: 15 years. Realistic energization: 2029 to 2030. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Chicago: what a 50 MW connection costs under Commonwealth Edison](https://open-factory.com/power/chicago/): In Chicago, Commonwealth Edison connects a 50 MW load under Revised General Terms and Conditions for large loads plus FERC-approved Transmission Security Agreements (TSAs), docket ICC 25-0677 (approved). Minimum bill: committed revenue contributions with shortfall payments if usage misses commitments. Term: not published. Realistic energization: 2031. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Bay Area: what a 50 MW connection costs under Pacific Gas and Electric](https://open-factory.com/power/bay-area/): In Bay Area, Pacific Gas and Electric connects a 50 MW load under Electric Rule 30 (retail transmission-level interconnection 50 to 230 kV; advance-and-refund), docket CPUC D.25-07-039 (Application 24-11-007). Minimum bill: none (Rule 30 is a cost mechanism; PG&E has no large-load minimum-take tariff). Term: none in Rule 30. Realistic energization: 2031 to 2032. Open Factory's Large-Load Cost Table, as of August 21, 2026. - [Northern Indiana: what a 50 MW connection costs under Indiana Michigan Power](https://open-factory.com/power/northern-indiana/): In Northern Indiana, Indiana Michigan Power connects a 50 MW load under Industrial Power Tariff large-load amendments (settlement), docket IURC Cause 46097 (approved 2025-02-19). Minimum bill: not published for Indiana (I&M's proposed Michigan Large Power Tariff uses 90% of contract capacity). Term: at least 12 years after a ramp of up to 5 years. Realistic energization: 2028 to 2029. Open Factory's Large-Load Cost Table, as of August 21, 2026. ## US import duty by HTS line - [HTS 8504.22.00, Liquid-filled transformer, 650 to 10,000 kVA (pad-mount, substation): US import duty by origin](https://open-factory.com/tariffs/8504-22-00/): Liquid-filled transformer, 650 to 10,000 kVA (pad-mount, substation), HTS 8504.22.00, imported from China carries 50% all-in US duty (column 1 0%, Section 232 25%, Section 301 25%); the lowest of nine origins is Mexico at 25% and the highest China at 50%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8504.23.00, Liquid-filled transformer over 10,000 kVA (LPT, GSU): US import duty by origin](https://open-factory.com/tariffs/8504-23-00/): Liquid-filled transformer over 10,000 kVA (LPT, GSU), HTS 8504.23.00, imported from China carries 40% all-in US duty (column 1 1.6%, Section 232 13.4%, Section 301 25%); the lowest of nine origins is Mexico at 13.4% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8504.33.00, Dry-type transformer, 16 to 500 kVA: US import duty by origin](https://open-factory.com/tariffs/8504-33-00/): Dry-type transformer, 16 to 500 kVA, HTS 8504.33.00, imported from China carries 51.6% all-in US duty (column 1 1.6%, Section 232 25%, Section 301 25%); the lowest of nine origins is Mexico at 25% and the highest China at 51.6%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8504.34.00, Dry-type transformer over 500 kVA: US import duty by origin](https://open-factory.com/tariffs/8504-34-00/): Dry-type transformer over 500 kVA, HTS 8504.34.00, imported from China carries 40% all-in US duty (column 1 1.6%, Section 232 13.4%, Section 301 25%); the lowest of nine origins is Mexico at 13.4% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8535.30.00, MV isolating and make-and-break switches, over 1,000 V: US import duty by origin](https://open-factory.com/tariffs/8535-30-00/): MV isolating and make-and-break switches, over 1,000 V, HTS 8535.30.00, imported from China carries 40.2% all-in US duty (column 1 2.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8536.20.00, LV automatic circuit breakers: US import duty by origin](https://open-factory.com/tariffs/8536-20-00/): LV automatic circuit breakers, HTS 8536.20.00, imported from China carries 40.2% all-in US duty (column 1 2.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8537.10.60, Motor control centers: US import duty by origin](https://open-factory.com/tariffs/8537-10-60/): Motor control centers, HTS 8537.10.60, imported from China carries 40.2% all-in US duty (column 1 2.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8537.10.91, LV panels, switchboards, PLCs and controls, other: US import duty by origin](https://open-factory.com/tariffs/8537-10-91/): LV panels, switchboards, PLCs and controls, other, HTS 8537.10.91, imported from China carries 40.2% all-in US duty (column 1 2.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8537.20.00, MV switchgear assemblies, over 1,000 V: US import duty by origin](https://open-factory.com/tariffs/8537-20-00/): MV switchgear assemblies, over 1,000 V, HTS 8537.20.00, imported from China carries 40.2% all-in US duty (column 1 2.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8502.13.00, Diesel generating set over 375 kVA: US import duty by origin](https://open-factory.com/tariffs/8502-13-00/): Diesel generating set over 375 kVA, HTS 8502.13.00, imported from China carries 39.5% all-in US duty (column 1 2%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 39.5%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8502.39.00, Other generating sets (gas turbine gensets): US import duty by origin](https://open-factory.com/tariffs/8502-39-00/): Other generating sets (gas turbine gensets), HTS 8502.39.00, imported from China carries 40% all-in US duty (column 1 2.5%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8411.81.80, Gas turbine, not over 5,000 kW, non-aircraft: US import duty by origin](https://open-factory.com/tariffs/8411-81-80/): Gas turbine, not over 5,000 kW, non-aircraft, HTS 8411.81.80, imported from China carries 52.5% all-in US duty (column 1 2.5%, Section 232 25%, Section 301 25%); the lowest of nine origins is Mexico at 25% and the highest China at 52.5%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8411.82.80, Gas turbine over 5,000 kW, non-aircraft: US import duty by origin](https://open-factory.com/tariffs/8411-82-80/): Gas turbine over 5,000 kW, non-aircraft, HTS 8411.82.80, imported from China carries 40% all-in US duty (column 1 2.5%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8418.69.01, Chillers and other refrigerating equipment, nesoi: US import duty by origin](https://open-factory.com/tariffs/8418-69-01/): Chillers and other refrigerating equipment, nesoi, HTS 8418.69.01, imported from China carries 37.5% all-in US duty (column 1 0%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 37.5%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8457.10.00, Machining centers for working metal: US import duty by origin](https://open-factory.com/tariffs/8457-10-00/): Machining centers for working metal, HTS 8457.10.00, imported from China carries 40% all-in US duty (column 1 4.2%, Section 232 10.8%, Section 301 25%); the lowest of nine origins is Mexico at 10.8% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8458.11.00, Horizontal CNC lathes: US import duty by origin](https://open-factory.com/tariffs/8458-11-00/): Horizontal CNC lathes, HTS 8458.11.00, imported from China carries 41.9% all-in US duty (column 1 4.4%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 41.9%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8460.23.00, CNC cylindrical grinding machines: US import duty by origin](https://open-factory.com/tariffs/8460-23-00/): CNC cylindrical grinding machines, HTS 8460.23.00, imported from China carries 41.9% all-in US duty (column 1 4.4%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 41.9%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8462.23.00, CNC press brakes: US import duty by origin](https://open-factory.com/tariffs/8462-23-00/): CNC press brakes, HTS 8462.23.00, imported from China carries 41.9% all-in US duty (column 1 4.4%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 41.9%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8466.93.98, Parts and accessories for metal-cutting machine tools, other: US import duty by origin](https://open-factory.com/tariffs/8466-93-98/): Parts and accessories for metal-cutting machine tools, other, HTS 8466.93.98, imported from China carries 42.2% all-in US duty (column 1 4.7%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 42.2%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8479.50.00, Industrial robots, nesoi: US import duty by origin](https://open-factory.com/tariffs/8479-50-00/): Industrial robots, nesoi, HTS 8479.50.00, imported from China carries 40% all-in US duty (column 1 2.5%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 40%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8544.42.90, Insulated conductors not over 1,000 V, fitted with connectors, other: US import duty by origin](https://open-factory.com/tariffs/8544-42-90/): Insulated conductors not over 1,000 V, fitted with connectors, other, HTS 8544.42.90, imported from China carries 52.6% all-in US duty (column 1 2.6%, Section 232 25%, Section 301 25%); the lowest of nine origins is Mexico at 25% and the highest China at 52.6%. Open Factory tariff schedule as of September 9, 2026. - [HTS 8544.60.40, Insulated copper conductors over 1,000 V: US import duty by origin](https://open-factory.com/tariffs/8544-60-40/): Insulated copper conductors over 1,000 V, HTS 8544.60.40, imported from China carries 41% all-in US duty (column 1 3.5%, Section 232 0%, Section 301 37.5%); the lowest of nine origins is Mexico at 0% and the highest China at 41%. Open Factory tariff schedule as of September 9, 2026. ## Optional - [About](https://open-factory.com/about/): who writes Open Factory and how it is funded - [Methodology](https://open-factory.com/methodology/): how the models are compiled and sourced - [Independence](https://open-factory.com/about/independence/): no vendor money, no sponsored research - [Corrections](https://open-factory.com/corrections/): every correction on the record - [Guides](https://open-factory.com/guides/): problem-first pieces, each with its direct answer - [Comparisons](https://open-factory.com/compare/): head-to-head pieces with the numbers on both sides - [Alternatives](https://open-factory.com/alternatives/): what else a buyer can pay for, priced, and whether Pro is worth it - [Changelog](https://open-factory.com/changelog/): every dated change, newest first - [Developers](https://open-factory.com/developers/): JSON API, OpenAPI, MCP server - [Subscribe](https://open-factory.com/subscribe/): free letter, Pro and Desk tiers - [RSS](https://open-factory.com/rss.xml): article feed - [llms-full.txt](https://open-factory.com/llms-full.txt): every article and model methodology as plain markdown